Providing Innovative Solutions to Creative Precast Designs

Architectural Precast Concrete, Thinshell, and GFRC - Willis Construction Co, Inc.

599 Castro Office

Location:
Mountain View, CA

Owner:
Sobrato Corporation

Architect:
Arc Tec Inc.

Structural Engineer:
Structural Engineers Inc.

General Contractor:
Devcon Construction

Project Highlights:
Project Size: 50,500 SF consisting or 518 panels
Precast Panel System: Glass Fiber Reinforced Concrete


Panels were cast with two mix designs in one panel. Both colors were given a light sandblasted finish. 3000 individual Limestone pieces were custom fabricated and cast into the GFRC panels to create the arched lintels and vertical window surrounds.

599 Castro is a 110,000 square foot, four-story mixed-use project with three levels of below grade parking located in downtown Mountain View, California. The project includes Class A office, retail, and residential with frontages on three streets including Mountain View's main downtown thoroughfare, Castro Street. The project shares the site with 100-year-old St. Joseph's Catholic Church. The church's traditional Mediterranean architectural style influenced the architecture of 599 Castro.

The developer and owner of the project chose to make 599 Castro their new headquarters and occupy the fourth floor of the building. In choosing the project as their corporate headquarters, the Owner wanted to develop a timeless building that would evoke the quality of design and development for which the organization is known. Early in the design process the team decided to use GFRC as the primary facade material for its high quality, lasting durability and the architectural look and feel it created. Once the GFRC was selected as part of the design, the challenges were to incorporate the high level of Mediterranean details needed for a successful project.

In addition to the detailing of the GFRC panels, the team developed details that incorporated custom carved limestone pieces into the GFRC. The combination of the details, materials, and careful changes in color and finish provided the project with the high-quality permanent feel the design required. In addition, the location of the project on an urban site in downtown Mountain View with zero lot lines along the street frontages required an efficient skin system for installation in the confined space. The panelized GFRC system helped with the restrictions of the site and helped with the construction schedule.



Willis Construction has been providing Architectural Precast Concrete building panels and products for the construction industry since 1979. Willis Construction is dedicated to providing Owners, Architects, and General Contractors with the design and engineering expertise necessary to meet the building challenges of today and the future. The quality, durability, and long life of Architectural Precast Concrete, Thinshell, and GFRC (Glass Fiber Reinforced Concrete) systems provide a wide range of design options for virtually every type of building. Contact us to decide which system would be best suited for your next project.

Noteworthy Precast Projects

Broad Museum

Broad Museum

Los Angeles, CA
  • GFRC (Glass Fiber Reinforced Concrete)
  • 2015 PCI National Award Winner
Hollywood Park Office

Hollywood Park Office

Inglewood, CA
  • Pre-Glazed GFRC (Glass Fiber Reinforced Concrete)
  • 2022 PCI National Award Winner
1550 Mission Street Housing

1550 Mission Street Housing

San Francisco, CA
Academy Museum of Motion Pictures

Academy Museum of Motion Pictures

Los Angeles, CA

Projects in Progress

921 Howard Street

921 Howard Street

San Francisco, CA
  • Thinshell Precast
IQHQ Building 48

IQHQ Building 48

San Diego, CA
  • Architectural Precast and Glass Fiber Reinforced Concrete
Tasman Coterie

Tasman Coterie

Santa Clara, CA
  • Pre Glazed Architectural Precast
USGS NASA Ames

USGS NASA Ames

Mountain View, CA
  • GFRC (Glass Fiber Reinforced Concrete) and Architectural Precast

* PCI Certification confirms that a manufacturing plant has an ongoing quality assurance system in place. PCI Certification requires that the plant must consistently demonstrate their commitment to quality principles and procedures. A 120 point audit examines all aspects of plant operation including engineering practices and management commitment.

PCI Certified